22908_HHT_Holiday Inn Express_NY_FlippinhBook

T1.1 COVER SHEET SHEET INDEX T1.1 COVER SHEET SHEET DESCRIPTION REVISION VICINITY MAP PROJECT DIRECTORY CONSULTANT CLIENT 1ST FLOOR PLAN AERIAL A1.2 SYMBOL LEGEND PROJECT PROJECT PHOTO A1.1 2ND FLOOR PLAN A1.3 No. Date Description SHEET: Sheet Title: PROJECT NUMBER: 22908 REVIEWED BY: A.V DWG. DATE: 11.05.2018 Project Address: Consultant: Project Owner: HOLIDAY INN EXPRESS 232 W. 29TH STREET NEW YORK, NY 10001 DRAWN BY: HT TEMPLATE TYPE: Stamp: Consultant: Plans, maps, specifications, studies, and reports not containing a wet ink seal imprint accompanied by an original signature by the licensed professional may have been fraudulently altered and shall not be considered an original copy. All information should be disregarded unless verified by the professional whose signature appears above. All drawings and written material appearing herein constitute original and unpublished work of the architect and may not be duplicated, used or disclosed without written consent of the architect. Copyright Protected 2018. 20521 EARL STREET TORRANCE, CA 90503 T. 310-343-3430 LOS ANGELES OFFICE SOLUTIONS 370 LIBBEY INDSUTRIAL PARKWAY WEYMOUTH, MA 02189 T. 781-337-9012 www.menemshasolutions.com BOSTON OFFICE UNIT 600 3RD FLOOR PLAN MENEMSHA CONSTRUCTION SOLUTIONS 25021 EARL STREET TORRANCE, CA 90503 PROJECT MANAGER : YURI OSIPOV TEL/eFAX: 310-263-3545 EMAIL: yosipov@menemshasolutions.com HOLIDAY INN EXPRESS 232 W. 29TH STREET NEW YORK, NY 10001 4TH FLOOR PLAN A1.5 A1.4 5TH FLOOR PLAN A1.6 6TH FLOOR PLAN 7TH FLOOR PLAN A1.8 A1.7 8TH FLOOR PLAN A1.9 9THTH FLOOR PLAN 10TH FLOOR PLAN A1.11 A1.10 11TH FLOOR PLAN A1.12 12TH FLOOR PLAN 15TH FLOOR PLAN A1.13 HERSHA HOSPITALITY TRUST 510 WALNUT ST, 9TH FLOOR PHILADELPHIA, PA 19106 TEL: 215-717-2746 A2.2 A2.1 A2.3 A2.5 A2.4 A2.6 A2.8 A2.7 A2.9 A2.11 A2.10 A2.12 A2.13 1ST FLOOR REFLECTED CEILING PLAN 2ND FLOOR REFLECTED CEILING PLAN 3RD FLOOR REFLECTED CEILING PLAN 4TH FLOOR REFLECTED CEILING PLAN 5TH FLOOR REFLECTED CEILING PLAN 6TH FLOOR REFLECTED CEILING PLAN 7TH FLOOR REFLECTED CEILING PLAN 8TH FLOOR REFLECTED CEILING PLAN 9TH FLOOR REFLECTED CEILING PLAN 10TH FLOOR REFLECTED CEILING PLAN 11TH FLOOR REFLECTED CEILING PLAN 12TH FLOOR REFLECTED CEILING PLAN 15TH FLOOR REFLECTED CEILING PLAN BASEMENT FLOOR PLAN A1.0 A2.0 BASEMENT REFLECTED CEILING PLAN PROJECT SITE PROJECT SITE NOTE TAG PLAN ORIENTATION BREAK LINE ROOM NAME CEILING HEIGHT ABOVE FINISHED FLOOR UP STAIR DIRECTION XXXX LEVEL CHANGE CLNG HT #'-#" # +XX" +XX" +XX" HEIGHT ABOVE F.F. PACKAGED TERMINAL AIR CONDITIONER (PTAC) L W H HT. AFF. FF. SYMBOL LEGEND 1. AREAS SHOWN AS "NO ACCESS" INDICATE AREAS THAT WERE INACCESSIBLE AT TIME OF SURVEY. SEVERAL ATTEMPTS WERE MADE TO GATHER INFORMATION IN THESE AREAS UNSUCCESSFULLY 2. ACTUAL STRUCTURAL ELEMENTS NOT DOCUMENTED AT TIME OF SURVEY. SURVEY DID NOT INCLUDE INVESTIGATION BEHIND WALLS OR ABOVE CEILING TO DETERMINE ACTUAL STRUCTURAL PROPERTIES OF LOAD BEARING ELEMENTS. TYPICAL THROUGHOUT

RkJQdWJsaXNoZXIy Mzk2ODQz